Use AI on the documents and decisions that move a project: bid reviews, RFIs, submittals, change orders, site progress and project controls, while design professionals and project managers keep responsibility for what is built and what is signed.

Energy, resources and industrials
Construction and engineering projects generate an enormous record: drawings, specifications, models, schedules, RFIs, submittals, daily reports, photographs and correspondence, spread across owners, designers, contractors and many subcontractors. Margins are thin, schedules are tight and skilled labor is scarce, so a missed clause in a specification or a slow answer to an RFI can ripple into rework, delay and dispute.
AI changes the work where people read, compare and track at volume. It can review a bid package for scope gaps and unusual terms, check a submittal against the specification section it answers, draft a response to a routine RFI for the designer's review, or compare site photographs and scans with the schedule to show where work stands. Project controls teams can use it to relate change orders, delays and costs, which matters most when a claim is being prepared.
Valtair helps contractors, engineering firms and project owners choose the project workflows worth changing, and builds assistants into the document control, scheduling and model environments their teams already use. Responsibility stays where contracts put it: licensed professionals approve design decisions, project managers commit cost and time, and AI suggestions are designed to show the drawing, specification clause or report they came from.
Estimating teams review large tender packages under deadline. The leadership question is where AI may summarize scope, flag unusual contract terms and compare quantities with past projects, how its findings reach the bid or no-bid decision, and who confirms the risk allowances that go into the price.
Each project answers similar questions about details, products and coordination, yet past answers are hard to find on the next job. The decision is which RFIs, submittals and lessons learned to make searchable, how they are tagged by system and trade, and how outdated or project-specific answers are kept from careless reuse.
Reality capture, drones and site photographs can show installed work, but progress also drives payment, schedule updates and disputes. Leaders must agree how measured progress is compared with the schedule and cost plan, who validates it before it informs a pay application, and how disagreements with subcontractors are resolved.
Owners increasingly expect models, as-built records and maintenance information at completion, while contractors want lessons and costs for future bids. Leadership must decide which data each party retains under the contract, how it is structured for reuse, and how confidentiality obligations to clients and partners are respected.
Summarize scope, exclusions and unusual clauses across tender documents and contracts, and highlight conflicts between drawings, specifications and terms for the estimator and commercial manager to resolve.
Compare product data, shop drawings and samples with the specification section they answer, list apparent deviations, and prepare the review for the design professional who approves or rejects it.
Find related RFIs, drawings and specification clauses for a new question, draft a response from the project record, and route it to the responsible designer for review before issue.
Compare photographs, laser scans and drone surveys with the model and schedule to estimate installed quantities, and present differences to the project controls team for validation.
Link change orders, correspondence, schedule updates and daily reports to the events behind them, so commercial teams can assemble entitlement and cost evidence with its sources.
Turn foremen's voice notes, photographs and logs into structured daily reports, highlight recurring quality or safety observations, and send them to the site manager who decides on action.
Design decisions, sealed drawings and submittal approvals carry professional and contractual liability. AI is positioned to prepare and check, not to approve: outputs are marked as drafts, routed to the named professional and logged with their response, giving the project record a clear account of who accepted responsibility.
Joint venture partners, owners, designers and subcontractors join and leave, each with their own systems and contract terms. Designs respect who owns each document and model, separate data between projects and clients, and work through the shared project platform and document control already adopted rather than creating a parallel record.
Sites have patchy coverage, gloves, noise and layouts that change as work advances. Field tools are designed for quick capture by voice and photograph, to keep working without a signal, and to fit existing routines such as daily reports and toolbox talks, so crews are not asked to stop work to feed a system.