AI engineering

Prepare an AI application for release with repeatable evaluation, controlled deployment and a way back when quality falls.

Compare first. Then promote.

Engagement scope

What the work delivers.

A prompt change can improve common requests while breaking rare, expensive cases. We build the engineering controls that make those trade-offs visible before a release reaches users.

Illustrative workflow
  1. Replay known cases
  2. Compare the candidate with the current release
  3. Promote or roll back the version

Evaluation suite

Turn real examples and edge cases into repeatable checks.

Release pipeline

Version models, prompts and retrieval settings alongside the application.

Production controls

Set up tracing, staged rollout and rollback paths for the operating team.

When to bring us in

  • An AI feature works in testing, and the people accountable for releasing it cannot say how they would know if a change made it worse.
  • Your team edits prompts, models or retrieval settings directly in production, and nobody can reconstruct which version produced a given answer.
  • A model provider has announced a new version or the retirement of an old one, and you need to know what changes for your users before you switch.
  • A complaint about a wrong answer took far too long to investigate because requests, retrieved sources and model outputs were not recorded together.

How the engagement runs

  1. Define release-ready

    Agree with the product owner and risk owner which failures would block a release, which are tolerable, and who decides when the evidence is mixed.

  2. Build the evaluation suite

    Assemble cases from real traffic and known incidents, including rare and expensive ones, with grading criteria a reviewer would recognize and a baseline score for the current release.

  3. Version the whole release

    Bring prompts, model versions, retrieval settings and evaluation results into the same release process as the application, so any production answer can be traced to its configuration.

  4. Rehearse the way back

    Set up tracing and staged rollout, and exercise promotion and rollback with the operating team so returning to the previous version is a practiced step rather than an improvisation.

Decisions that shape the outcome

Averages hide the expensive failures

A candidate can raise its overall score while getting worse on a small group of high-cost cases, such as refund decisions or contractual wording. We weight and report those groups separately so the release decision sees them. Teams that track a single aggregate number tend to discover the regression from a customer.

How far to trust automated grading

Model-graded checks let a suite run on every change, but a grader can share the blind spots of the system it grades. We calibrate graders against human judgments on a sample and keep human review for the criteria where the two disagree. Uncalibrated grading produces confident scores that do not predict what users experience.

What counts as a version

An AI release is more than code. The prompt, the model identifier, retrieval settings, the index snapshot and tool definitions all change behavior. If any of them can change outside the release process, a rollback restores the code and keeps the behavior that caused the problem. We define the versioned unit with your platform team.

Is this the right service?

If the feature does not exist yet, AI development builds it, and AI engineering can follow or run alongside.

Keeping a released service healthy day to day, with monitoring, incident playbooks and cost reviews, is AI operations. Deciding who approves a use case and on what evidence is AI governance.

Also in AI and application engineering

Industries where it applies

Common questions

Can you take on an AI system another team built?

Yes. AI engineering often starts from a system that is already in use. We review how it is evaluated, versioned and deployed today, and build the missing controls around the existing code rather than rewriting the application. Where the review finds deeper design problems, we set them out for your decision.

How large does an evaluation suite need to be?

Large enough to represent the cases that matter, which depends on the task more than on a target count. A suite weighted toward rare, consequential requests is often more useful than a large sample of routine ones. It grows as production traffic and incident reviews reveal new kinds of failure.

Will this slow down how often we can release?

The aim is the opposite. When changes are checked automatically against a known baseline, teams can ship prompt and model updates with less manual testing and less hesitation. The added effort sits at the start, in building the suite and the pipeline, and in agreeing who decides on borderline results.

What happens when a model provider changes or retires a model?

The evaluation suite lets you compare the replacement with the current release on your own cases before switching. Where the application keeps model calls behind a provider-neutral layer, the candidate can be tested in staging and promoted through the same pipeline as any other change.

Will our operating team own the pipeline afterward?

That is the usual intent, and the production controls are set up for the team that will run them. Handover covers how to read traces, interpret evaluation results and carry out a rollback. Any continuing involvement from us is set out in the engagement agreement.

Related perspectives

Discuss the brief.

Which AI system is nearing release, and which failures would make it unfit for production?

Book a discovery call