High-performance computing

Match demanding simulations and compute jobs to the storage, networking and scheduling they need.

Find the bottleneck first.

Engagement scope

What the work delivers.

Buying additional processors helps only when compute is the limiting resource. We profile a representative job across the full path from input staging to final results before specifying capacity.

Illustrative workflow
  1. Benchmark a representative simulation
  2. Find the limiting resource
  3. Test the revised cluster configuration

Workload benchmark

Measure compute time, memory pressure, storage throughput and interconnect demand.

Cluster design

Select processors, storage and scheduling policies for the observed job mix.

Operating model

Define queues, allocation, monitoring and reproducible job environments.

When to bring us in

  • Engineers or researchers wait in a queue for results, and pressure to buy more nodes is growing without evidence that compute is the constraint.
  • An existing cluster is nearing the end of its life, and its replacement needs to reflect today's job mix rather than the one it was bought for.
  • Your teams are weighing owned capacity against cloud capacity for peak demand and need a comparison based on their own jobs rather than list prices.
  • Model training is arriving on infrastructure designed for simulation, and the two workloads now compete for the same accelerators, memory and storage.

How the engagement runs

  1. Characterize the job mix

    Study scheduler history and talk to the people who submit work, so the design reflects the full range of jobs, including the rare large runs that set deadlines.

  2. Profile representative jobs

    Instrument selected jobs to see where time goes, across data staging, memory, computation, communication between nodes and writing results, and identify the resource that limits each.

  3. Design cluster and scheduling policy

    Specify the balance of processors, accelerators, memory, storage tiers and interconnect, and the scheduling rules that decide whose work runs first when demand exceeds capacity.

  4. Validate and agree operating rules

    Rerun the benchmarks on the revised configuration and settle allocations, fair-share policy and environment management with the teams who will depend on the cluster.

Decisions that shape the outcome

Throughput or time to one result

A cluster tuned to run many small jobs at once is designed differently from one that must finish a single very large simulation by a deadline. Both claims on the budget are reasonable. Deciding which matters more, and for whom, avoids a design that serves the average job and fails the important one.

Owned capacity, cloud or both

Owned hardware pays off when utilization stays high and demand is steady. Cloud capacity suits bursts and experiments but grows expensive for sustained runs and large data transfers. The comparison depends on your own utilization pattern, data volumes and how quickly the hardware would be outgrown.

Reproducible job environments

When a result has to be reproduced later for a review or a dispute, the software environment, libraries and input versions matter as much as the hardware. Containerized, versioned job environments take some setup effort and remove a common source of disagreement about why a rerun produced a different answer.

Is this the right service?

If the demanding workload is a model trained on your data, the questions about datasets and evaluation belong with AI model training.

For serving trained models to users or applications within response-time and cost limits, see model inference.

Also in Data and computing infrastructure

Industries where it applies

Common questions

Do you need access to our production cluster?

Not necessarily. Scheduler records and a set of representative jobs can be profiled with your administrators on the existing system, on a test partition or on comparable capacity. Where the inputs are sensitive, profiling is arranged inside your environment with data the owners have approved.

Does this cover accelerated computing as well as traditional simulation?

Yes. Many job mixes now combine simulation, data processing and model training, and each places different demands on accelerators, memory and storage. The benchmark covers the workloads you expect to run, so the design can decide whether they share hardware or need separate pools.

Will you recommend a hardware supplier?

The cluster design specifies the capabilities each workload needs rather than starting from a supplier's catalog. Your procurement process can compare offers against that specification and the benchmark results, which can be rerun on candidate hardware where suppliers make it available.

How do you prioritize between teams competing for capacity?

Prioritization is a governance decision before it is a scheduler setting. We help leadership agree allocations, the priority given to deadline-driven work and how idle capacity is shared, and then express those rules in the scheduler so users can see them and administrators can adjust them.

Discuss the brief.

Which job takes too long, and what dataset, deadline and queue conditions can we benchmark?

Book a discovery call